Bump-in
The period in which material, equipment and overlay arrive at a venue and are installed, before the event opens.
Why it matters operationally
Bump-in is where a plan meets a loading dock. Every quantity that was argued over in a spreadsheet turns up as pallets in a service road during a window that is usually measured in days and shared with every other department doing the same thing. Sequencing depends on knowing totals in advance; a department that turns up with three times what was agreed takes the dock time of the one behind it.
How Roadmap handles it
The approved request for each space is what bump-in is worked from, and it is current by construction rather than by someone re-sending a sheet the night before.